A. correctness
B. integrity
C. maintainability
D. all of the mentioned
Explanation: Mean time to change (MTTC. is the time it takes to analyze the change request, design an appropriate modification, implement the change, test it, and distribute the change to all users.
Advertisement
Related Mcqs:
- Size and Complexity are a part of____________________?
- A. Product Metrics B. Process Metrics C. Project Metrics D. All of the mentioned...
- Which of the following is the task of project indicators ?
- A. help in assessment of status of ongoing project B. track potential risk C. help in assessment of status of ongoing project & track potential risk D. none of the mentioned...
- The intent of project metrics is_____________________?
- A. minimization of development schedule B. for strategic purposes C. assessing project quality on ongoing basis D. minimization of development schedule and assessing project quality on ongoing basis...
- Which of the following web engineering metric measures the extent of relatedness between two or more web pages ?
- A. Number of Static Content Objects B. Number of Dynamic Content Objects C. Web Page Similarity D. Number of Internal Page Links...
- Statement and branch coverage metrics are part of______________________?
- A. Analysis Model B. Testing C. Design Model D. Source Code...
- Function Point Computation is given by the formula___________________?
- A. FP = [count total * 0.65]+ 0.01 * sum(Fi) B. FP = count total * [0.65 + 0.01 * sum(Fi)]. C. FP = count total * [0.65 + 0.01] * sum(Fi) D. FP = [count total * 0.65 + 0.01]* sum(Fi)...
- Which of the following is not a web engineering project metric ?
- A. Number of Static Content Objects B. Number of Dynamic Content Objects C. Number of Inherited Objects D. Word Count...
- Percentage of modules that were inspected is a part of__________________?
- A. Product Metrics B. Process Metrics C. Project Metrics D. All of the mentioned...
- The arc-to-node ratio is given as r = a/n. What does ‘a’ represent in the ratio ?
- A. maximum number of nodes at any level B. longest path from the root to a leaf C. number of modules D. lines of control...
- Cost and schedule are a part of_________________________?
- A. Product Metrics B. Process Metrics C. Project Metrics D. All of the mentioned...
Advertisement